Section 880-X-10D-.59 - Subsidence Control: Public Notice (Alabama Administrative Code)

§ 880-X-10D-.59. Subsidence Control: Public Notice

At least six (6) months prior to mining, or within that period if approved by the Regulatory Authority, the underground mine operator shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the operator's subsidence control plan may be examined.

Author: Randall C. Johnson

(Original filed November 14, 1989; effective March 7, 1991.)

Statutory Authority: Code of Ala. 1975, § 9-16-91.

Disclaimer: Lawrina has made every attempt to ensure the information on this page is accurate, but we cannot guarantee that Section 880-X-10D-.59 Subsidence Control: Public Notice is a replica of the current official text. Please use the external links to official resources for the latest version.

We use Cookies to make Your experience on the Portal greater. To learn more about Cookies we use, please read Our Cookie Policy. Do you allow us to use Cookie?
Learn more Accept Cookies